The Padma Multipurpose Bridge

1. Padma Bridge Official Name= The Padma Multipurpose Bridge.
2. Name of the Padma Bridge project = The Padma Multipurpose Bridge Project
3.The loan agreement with the World Bank was signed on April 26, 2011 (US$ 1.2 billion).
4.The World Bank canceled the agreement on June 30, 2012.
5.Work on the Padma Bridge began on December 6, 2014. (Agreement signed on 16 June 2014).
6.Director of Padma Bridge Project Md. Shafiqul Islam.
7. The place connecting Padma Bridge is Mawa in Munshiganj and Jajira end of Shariatpur.
(Padma Bridge is located in 03 districts - Munshiganj Madaripur Shariatpur)
8.The Padma Bridge will connect 29 districts. With 21 districts in the south and southwest.
9.The company contracted for the construction of the Padma Bridge is China Major Bridge Engineering Construction Company Limited,
 a subsidiary of China Railway Group Limited.
10. The Padma Bridge will have gas-electricity optical fiber connection transport facility.
11. The road connecting Padma bridge is 14 km.
12. In the Padma Bridge project, the river has been governed for 12 km on both banks
13. Sinohydro Corporation of China gets the job of river management of Padma bridge.
14.Who designed the Padma bridge?=AECOM ( Architecture, Engineering, Consulting, Operation and Maintenance)
15.Who gives important advice regarding the piles of Padma bridge ==COWI
16. Who is in charge of supervising the Padma Bridge  ==Korean Expressway and the Bangladesh Army?
17. The Korean Expressway and the Bangladesh Army are in charge of overseeing the Padma Bridge.
18.The Padma Bridge is two-storied, made of concrete and steel (the first in the world)
19.What is the length of Padma bridge  ==6.15 km(20200 Feet)?
20.What is the total length of Padma bridge==9.30 km(3.15 km with connecting road)
21. What is the width of Padma bridge ==18.10 Meter(59.4 feet, 72 feet with four lane road)
22. The Number of Piller = 42
(There are 8 pilings for each pillar, but due to soil complexity, 22 pillars have been piling 06 each, the total piling is 28, the depth of piling is 363 feet.)))
23. The Number of Span = 41 (Each 150 Meter)
24.What is the weight of each span == 3200 Ton.
What is the name of the ship carrying the span == Tian e
Ship carrying capacity of span = 3600 tons.
25. The first span was installed on September 30, 2016 (on pillars 37 and 38).
26. The 41st, the last span, is set for December 10, 2020 (World Human Rights Day) (at 12.02 pm on Pillars 12 and 13).
27. It takes 3 years 2 months 10 days to place 41 spans
28.The railway line will be laid on the Padma bridge through the ground floor i.e. through the span.(Meter gauge and broad gauge can run any train at the same time)
29. How many kilometers is the viaduct of Padma bridge == 3.18 km
30. How many viaduct pillars of Padma bridge  = 81
31What is the earthquake tolerance level of Padma bridge == 9 Richter Scale.
32.What is the coordinate of Padma bridge == 23.4460 degrees (north), 90.2623 degrees (east).
33. What is the height of Padma bridge from water level == 60 feet (18 meters)
34. What is the name of the military cantonment near Padma bridge = Padma cantonment.
35. How many police stations near Padma bridge == (2) = Padma bridge north, Padma bridge south.
36. What is the name of the longest road bridge in Bangladesh == Padma Bridge (formerly Jamuna Bridge was 4.6 km, 50 pillars, 49 spans
37.What is the name of the world's first longest bridge built over the river == Padma Bridge
38. Padma Bridge, the longest bridge in the world = 11th.
39. What is the rank of Padma Bridge in the list of largest road bridges = 25th (2nd in Asia)
40.What is the position of Padma Bridge in the list of the largest road bridges in Asia == 2nd
41.What will be the shape of Padma bridge = "S" shape.
42. How many people have worked to build the Padma Bridge == About 4,000 people.
43. How many hectares of land were acquired for the Padma Bridge == 918 hectares.
44. What is the total cost of the Padma Bridge == 30 thousand 193 crore.
45. How long will it take to collect toll on Padma bridge = 35 years.
46. How many years is the lifespan of Padma bridge == 100 years.
47. What percentage of Bangladesh's GDP will increase due to the Padma Bridge == 1.23 percent
48. Who will maintain the Padma Bridge === Bangladesh Bridge Authority (BBA = The Bangladesh Bridge Authority)
49. Padma Bridge website address = www.padmabridge.gov.bd
50.In what year did this rumor spread that people would need their heads on the Padma Bridge === July, 2019.
51. In what year was the Padma Bridge inaugurated on 25th June 2022? (Bangla = 11 Ashar, 1429 BS) (Arabic = 25 Zilkad, 1443 AH).





 